PoC Topics: Difference between revisions

From INTwiki
Jump to: navigation, search
Line 26: Line 26:


= Feeding back the results =  
= Feeding back the results =  
As soon as experimental results relevant for a given MEC PoC Topic are available (no need to wait for the PoC Project to be completed), the PoC Team creates a contribution and informs the ISG MEC by email (if the PoC Topic had a specific template for feedback contributions, it should be used). PoC Teams are also encouraged to contribute additional results and lessons learned during the PoC Project to the ISG MEC.
As soon as experimental results relevant for a given NTECH/AFI PoC Topic are available (no need to wait for the PoC Project to be completed), the PoC Team creates a contribution and informs the NTECH AFI WG by email (if the PoC Topic had a specific template for feedback contributions, it should be used). PoC Teams are also encouraged to contribute additional results and lessons learned during the PoC Project to the NTECH AFI WG.

Revision as of 12:56, 6 July 2015

Rationale

PoC Topics are specific areas, often linked to a Work Item, where input or feedback from the AFI Proofs of Concept is needed. AFI PoC Topics help to focus PoC Projects on the most relevant topics for TC NTECH/AFI, and to increase the relevance of their contributions.

NTECH/AFI PoC Topics are identified and documented by NTECH AFI WG. NTECH/AFI PoC Topics may include templates for the PoC Contributions and deadlines to ensure that the PoC Contributions arrive on-time to be taken into account by the targeted WIs.

MEC PoC Topics

ID PoC Topic Status WI(s) PoC Feedback Template Deadline
- - - - - -

Addressing a PoC Topic in a PoC Project

PoC Teams specify the targeted PoC Topic(s) in their PoC Proposal, and commit to provide the expected input or feedback in the requested format (template, if applicable) in a timely manner.

Feeding back the results

As soon as experimental results relevant for a given NTECH/AFI PoC Topic are available (no need to wait for the PoC Project to be completed), the PoC Team creates a contribution and informs the NTECH AFI WG by email (if the PoC Topic had a specific template for feedback contributions, it should be used). PoC Teams are also encouraged to contribute additional results and lessons learned during the PoC Project to the NTECH AFI WG.