PoC Framework: Difference between revisions

From INTwiki
Jump to: navigation, search
No edit summary
Line 1: Line 1:
__TOC__
__TOC__


= MEC PoC Framework Document =
= AFI PoC Framework Document =
The MEC Proof of Concept (PoC) Framework GS describes the full IEG MEC PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded from:
The AFI Proof of Concept (PoC) Framework TS describes the full NTECH AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded from:


[http://docbox.etsi.org/ISG/MEC/ieg/70-Draft/IEG5/MEC-IEG005v030.docx (final draft for approval)].
[TBC (final draft for approval)].


For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
Line 10: Line 10:
= Templates =
= Templates =


[[Media:MEC_PoC_proposal_template.doc | MEC PoC Proposal Template (word)]]
[[Media:AFI_PoC_proposal_template.doc | AFI PoC Proposal Template (word)]]


[[Media:MEC_PoC_report_template.doc | MEC PoC Report Template (word)]]
[[Media:AFI_PoC_report_template.doc | AFI PoC Report Template (word)]]


= PoC Topics =
= PoC Topics =


PoC Projects are expected to be scoped arround PoC Topics identified and agreed by ISG MEC. [[PoC Topics|See details and current list of PoC Topics]].
PoC Projects are expected to be scoped arround PoC Topics identified and agreed by NTECH AFI WG. [[PoC Topics|See details and current list of PoC Topics]].


= Acceptance Criteria =
= Acceptance Criteria =
Line 23: Line 23:
* The PoC Team will have at a minimum 3 different organizations:
* The PoC Team will have at a minimum 3 different organizations:
** at least one network operator;
** at least one network operator;
** at least one infrastructure provider;
** at least two vendors
** at least one content/application provider.
* The PoC Point of Contact will be an NTECH AFI WG Participant.
* The PoC Point of Contact will be an ISG MEC Member or ISG MEC Participant.
* The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
* The PoC Proposal will address at least one of the PoC topics listed on the MEC Wiki.
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, NTECH meeting, a related conference, or other events
* The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, ISG MEC meeting, a related conference, or other events


= CTI support =
= CTI support =
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.  
The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.  


MEC PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].
AFI PoC Teams may request CTI assistance by [mailto:CTI_Support@etsi.org?Subject=MEC_PoC-Support_Request contacting ETSI CTI].


= About ISG MEC =
= About NTECH AFI =
ISG MEC is creating a standardized, open environment which will allow the efficient and seamless integration of applications from vendors, service providers, and third-parties across multi-vendor Mobile-edge Computing platforms.
TBC
 
ISG MEC has developed a MEC PoC Framework to coordinate and promote multi-vendor Proofs of Concept illustrating key aspects of the ISG MEC work.
 
[http://www.etsi.org/technologies-clusters/technologies/mec Learn more about ISG MEC]

Revision as of 13:00, 6 July 2015

AFI PoC Framework Document

The AFI Proof of Concept (PoC) Framework TS describes the full NTECH AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded from:

[TBC (final draft for approval)].

For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

AFI PoC Proposal Template (word)

AFI PoC Report Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by NTECH AFI WG. See details and current list of PoC Topics.

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least two vendors
  • The PoC Point of Contact will be an NTECH AFI WG Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, NTECH meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

AFI PoC Teams may request CTI assistance by contacting ETSI CTI.

About NTECH AFI

TBC