PoC Framework: Difference between revisions

From INTwiki
Jump to: navigation, search
No edit summary
Line 5: Line 5:


[TBC (link to published doc)].
[TBC (link to published doc)].
[http://www.etsi.org/deliver/etsi_ts%5C103300_103399%5C103371%5C01.01.01_60%5Cts_103371v010101p.pdf NTECH AFI PoC Framework]


For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.
For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Revision as of 09:17, 3 September 2015

AFI PoC Framework Document

The AFI Proof of Concept (PoC) Framework TS describes the full NTECH AFI PoC activity process, roles, responsibilities, acceptance criteria, etc... The latest version of this document can be downloaded from:

[TBC (link to published doc)].

NTECH AFI PoC Framework

For convenience, direct links to the PoC Proposal/PoC Report Templates, PoC Topics and a summary of the PoC Proposal acceptance criteria are provided below.

Templates

AFI PoC Proposal Template (word)

AFI PoC Report Template (word)

PoC Topics

PoC Projects are expected to be scoped arround PoC Topics identified and agreed by NTECH AFI WG. See details and current list of PoC Topics.

Acceptance Criteria

The PoC Proposals shall fulfill the following acceptance criteria:

  • The PoC Proposal will follow the PoC Proposal Template
  • The PoC Team will have at a minimum 3 different organizations:
    • at least one network operator;
    • at least two vendors
  • The PoC Point of Contact will be an NTECH AFI WG Participant.
  • The PoC Proposal will address at least one of the PoC topics listed on the Wiki.
  • The PoC Proposal will commit for a demonstration of the PoC at a public event, e.g. Public Exhibition, NTECH meeting, a related conference, or other events

CTI support

The ETSI Center for Testing and Interoperability (CTI) can assist the PoC teams with test expertise, administration and project management.

AFI PoC Teams may request CTI assistance by contacting ETSI CTI.

About NTECH AFI

TBC